Civic and Justice
Fairfield, CA
HVAC and plumbing upgrades to replace existing chilled/hot water air handling units, New DDC controls, and Accessibility Upgrades to the restrooms and lobby. The existing space available for the replacement OF air handling units was very tight and required the design team to work closely to design the new systems.