UCD – FCCL FISH LAB

Laboratories

MECHANICAL AND ELECTRICAL

Byron, CA

Mechanical includes infrastructure to treat and control the water used for the fish hatchery areas.

Studying the Delta Smelt – Mechanical and Electrical – Mechanical includes chiller/heaters, filtration and piping for each building.  The chiller/heaters are used to maintain the water temperature for each building.  Project includes (4) 10.5 K water storage tanks and several process chillers and filters.